September, 8, 2025
Throughout the summer, the dry dock and the Bassin à Flot quay hosted several technical refit operations, mobilising the complementary expertise of Sea Pole La Rochelle member companies.
🔧 Cap d’Aunis dredger – Port Atlantique La Rochelle
A major maintenance operation was carried out, including:
-
Replacement of deck plates
-
Painting works
-
Refurbishment of the dredging trolley rail
-
Overhaul of hydraulic and aluminium control cabinets
-
Maintenance of thrusters and pump
-
Work on the davit crane
🔧 Hondarra dredger – Port of Bayonne
A ten-year scheduled technical overhaul with a particularly comprehensive scope of work:
-
Full inspection of the propulsion system and main engines
-
Maintenance of dredging pipelines
-
Electrical works
-
Complete dry-docking with repainting of both underwater and topside hull areas
👉 Congratulations and thanks to the Sea Pole La Rochelle member companies whose expertise ensures the performance and reliability of the vessels entrusted to them: LECAMUS – AIS ELEC – SETA – Ateliers Mécaniques des Pertuis.








