Skip to main content

Summer recap at Sea Pole La Rochelle

1757324743596
Summer recap at Sea Pole La Rochelle

September, 8, 2025

 

Throughout the summer, the dry dock and the Bassin à Flot quay hosted several technical refit operations, mobilising the complementary expertise of Sea Pole La Rochelle member companies.

🔧 Cap d’Aunis dredger – Port Atlantique La Rochelle

A major maintenance operation was carried out, including:

  • Replacement of deck plates

  • Painting works

  • Refurbishment of the dredging trolley rail

  • Overhaul of hydraulic and aluminium control cabinets

  • Maintenance of thrusters and pump

  • Work on the davit crane

 

 

🔧 Hondarra dredger – Port of Bayonne

A ten-year scheduled technical overhaul with a particularly comprehensive scope of work:

  • Full inspection of the propulsion system and main engines

  • Maintenance of dredging pipelines

  • Electrical works

  • Complete dry-docking with repainting of both underwater and topside hull areas

👉 Congratulations and thanks to the Sea Pole La Rochelle member companies whose expertise ensures the performance and reliability of the vessels entrusted to them: LECAMUS – AIS ELEC – SETA – Ateliers Mécaniques des Pertuis.

  • 1757324743596
Skip to content